Public Consultation

Closed Consultation (2024):

ElecLink consulted on a number of changes to the ElecLink Access Rules. This consultation closed on 10th September 2024.

Consultation Documents

ElecLink Access Rules

Download

Consultation Paper (English)

Download

Consultation Paper (French)

Download

Closed Consultation (2023):

ElecLink has opened a consultation on a number of modifications to the ElecLink Splitting Rules Methodology

Consultation Documents

A. Consultation paper

Download

B. Splitting Rules Methodology

Download

Closed Consultation (2022):

ElecLink consulted on a number of operational changes to the ElecLink Access Rules. This consultation closed on 20th January 2023.

Consultation Documents

A. Consultation paper (English)

Download

B. Consultation paper (French)

Download

C. Eleclink Access Rules

Download

Closed Consultation (2021):

ElecLink consulted on the ElecLink Splitting Rules Methodology. The consultation closed on 15 December 2021.

Consultation Documents

A. Consultation paper

Download

B. Splitting Rules Methodology Download

Download

C. CRE Decision on Splitting Rules Methodology

Download

Closed Consultations (2020):

ElecLink conducted a public consultation on the France – Great Britain Border Specific Annex to the Harmonised Allocation Rules from 23 March 2020 to 20 April 2020. The relevant documentation is available below.

Consultation Documents

A. Consultation paper

Download

B. FR-GB Border Specific Annex (clean)

Download

C. FR-GB Border Specific Annex (draft)

Download

D. Explanatory note

Download

Closed Consultations (2019) 2:

ElecLink conducted a public consultation on the amendment to the ElecLink Access Rules and Charging Methodology Statement from 1 April 2019 to 1 May 2019. The relevant documentation is available below.

Consultation Documents

A. ElecLink consultation paper

Download

B. ElecLink open season rules (clean)

Download

C. ElecLink open season rules (draft)

Download

D. Allocation rules for intraday capacity allocation on the ElecLink interconnector

Download

E. Explicit day ahead and intraday nomination rules for ElecLink

Download

F. Charging methodology statement

Download
Supporting Documents

G. Harmonised allocation rules

Download

H. Request for amendment by the NRAs to the GB-FR border specific annex

Download

I. JAO shadow allocation rules

Download

J. Channel regional long-term nomination rules

Download

K. Amended Channel regional long-term nomination rules (version published for consultation)

Download

L. Channel day ahead fallback methodology

Download

M. JAO participation agreement

Download

N. ElecLink nomination participation agreement

Download

Closed Consultations (2019) 1:

ElecLink conducted a public consultation on the ElecLink Access Rules and Charging Methodology Statement applicable in the event of a ‘no-deal’ Brexit scenario from 16 August 2019 to 13 September 2019. The relevant documentation is available below.

Consultation Documents

A. ElecLink consultation paper

Download

B. ElecLink non-IEM Access Rules

Download

C. Charging Methodology Statement

Download

Closed Consultations (2015):

ElecLink conducted a public consultation on the ElecLink Access Rules and Charging Methodology Statement from 22 October 2015 to 23 November 2015. The relevant documentation is available below.

Consultation Documents

ElecLink Consultation Paper – 22 October 2015

Download

ElecLink Access Rules (Draft for consultation) – 22 October 2015

Download

ElecLink Access Rules – redline version against IFA Access Rules version 9 (Draft for consultation) – 22 October 2015

Download

ElecLink Charging Methodology Statement (Draft for consultation) – 22 October 2015

Download

Synthesis of consultation responses – 29 February 2015

Download